CRYSTAL 40ZX USER GUIDE
3
2. INSTALLATION & COMMISSIONING
2.1 Requirements
Installation should be done by authorised & trained
personnel only in compliance with D.O.T. (Indian Deptt.
of Telecommunication) standards.
2.2 Site requirements
CRYSTAL is designed to work in a normal office
environment. The unit should be sited beside's the
operator in the reception area and should be away from :
Processes producing electricity, fumes, dust, gasses
or radiation (e.g. silicon or halon contamination from
photo copying or fire protection equipment)
Electrical meters or switchgears
Water pipe, gas meters, pipes or appliances
Dampness
Vibration
2.3 General
Ensure a good power point for the exchange with a 5 pin
socket & switch. If possible, the customer should be asked
to provide a " clean" power supply direct from the power
distribution board. CRYSTAL is set to work at 220V AC, 50Hz
mains supply.
Establish a firm ground outside the building. The ground
resistance should be within tolerance limit. Connect this
ground to earth terminal on the MDF.
NOTE :
A good earth is very essential for protection of junction
lines and proper functioning of the system.