EasyManua.ls Logo

Cumberland 4070 - Installation; Installation Scope and Site Preparation; Site Selection and Machine Setup

Default Icon
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
40 Series Granulators Page 17
3 Installation
3-1 Scope
This section contains all instructions required for
experienced installation personnel to install the
Cumberland granulator and prepare it for production. It is
essential to follow all instructions carefully and in the
sequence presented. Be sure to observe all DANGER,
WARNING, and CAUTION statements in order to
prevent personal injury or machine damage, and to observe
all NOTE statements which are designed to assist in the
performance of procedures.
3-2 General
The site selected for installation of the granulator should be
prepared in advance. Be certain that the area to be
occupied by the machine is clean, level and free of
obstructions. The site selected must have a floor rated to
easily support the weight of the machine. A concrete floor
of 100 mm minimum in thickness is recommended.
3-3 Set-up
Make certain the floor is clean, level, and free of
obstructions before placing the machine into position.
Visually inspect the hopper infeed opening to insure that no
stray packing material or debris are present.

Related product manuals