EasyManua.ls Logo

Dahua VTO1210B-X

Dahua VTO1210B-X
39 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
错误!使用“开始”选项卡将 Heading 1 应用于要在此处显示的文字。 15
4.2.2 VTO1220BW/VTO1210B-X
VTO1220BW/VTO1210B-X installation
Table 4-2 Item list
No.
Item
No.
Item
No.
Item
1
Wall
2
Plastic mounting box
3
Bracket
4
ST3×18 screw
5
M3×16 screw
6
VTO
Cut an opening with the size of the mounting box on the wall, and then put the mounting
box in.
Connect the ports on the rear panel to those in the wall through the bracket. See the
details in "2.4 Connecting Cable."
Fix the bracket on the mounting box with the ST3×18 screws.
Fix the VTO on the bracket with the M3×16 screws.
Put sealant between the VTO, mounting box, and the wall.

Other manuals for Dahua VTO1210B-X

Related product manuals