3 | Components
Service manual
161
EBLA09~16DA + EDLA09~16DA
Daikin Altherma 3 M
ESIE20-06A – 2021.03
Prerequisite: Remove the required plate work, see "3.17Plate work"[4230].
1 Turn ON the power of the unit.
2 Measure the voltage on the connectors X1A: 1‑3 and X19A: 1‑3 on the hydro
PCB.
Result: The measured voltage MUST be 230VAC.
a Connector X1A
b Connector X19A
Is the measured voltage on the hydro
PCB correct?
Action
Yes Return to "3.12.1Checking
procedures"[4160] of the hydro PCB
and continue with the next procedure.
No Continue with the next step.
Single phase units
1 Measure the output voltage on connector X803A: 1‑3 on the noise filter PCB.
Result: The measured voltage MUST be 230VAC.
Is the measured output voltage on the
noise filter PCB correct?
Action
Yes Correct the wiring between the noise
filter PCB and the hydro PCB, see
"6.2Wiring diagram"[4314].
No Perform a check of the noise filter PCB,
see "Checking procedures"[4194].
Three phase units
1 Measure the output voltage on connector X803A: 1‑3 on the main PCB.
Result: The measured voltage MUST be 230VAC.
Is the measured output voltage on the
main PCB correct?
Action
Yes Correct the wiring between the main
PCB and the hydro PCB, see "6.2Wiring
diagram"[4314].