EasyManua.ls Logo

Daikin AMST42CU1400AA - User Manual

Daikin AMST42CU1400AA
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
AMST***U1400**
AIR HANDLERS INSTALLATION &
OPERATING INSTRUCTIONS
© 2021-2023 Daikin Comfort Technologies Manufacturing, L.P.
19001 Kermier Rd., Waller, TX 77484
www.goodmanmfg.com -or- www.amana-hac.com
P/N: IO-4004C Date: April 2023
RECOGNIZE THIS SYMBOL
AS A SAFETY PRECAUTION.
NOTE: SPECIFICATIONS AND PERFORMANCE DATA LISTED HEREIN
ARE SUBJECT TO CHANGE WITHOUT NOTICE
Contents
1 Important Safety Instructions .................................... 2
2 Shipping Inspection ................................................... 3
2.1 Parts ....................................................................... 3
2.2 Handling ................................................................. 3
2.3 Shipping Material Removal..................................... 3
2.3.1 Blower Support Bracket Removal ....................... 3
3 Codes & Regulations ................................................. 3
4 Replacement Parts ..................................................... 4
5 Pre-Installation Considerations ............................... 4
5.1 Preparation ............................................................. 4
5.2 System Matches ..................................................... 4
5.3 Interconnecting Tubing ........................................... 4
5.4 Clearances ............................................................. 4
5.5 Horizontal Applications ........................................... 4
5.6 Access .................................................................... 4
6 Installation Location ................................................... 4
 .................................................. 4
6.2 Horizontal Left Installation ...................................... 5
 5
6.4 Humid Environment Installations ............................ 6
6.4.1 All Installations – Humid Environments ............... 6
 6
6.4.1.3 Horizontal Installations – Humid Environments 6
7 Refrigerant Lines ........................................................ 7
7.1 Tubing Size ............................................................. 7
7.2 Tubing Preparation ................................................. 7
7.3 Tubing Connections ................................................ 7
7.4 Thermal Expansion Valve System Adjustment ....... 9
8 Condensate Drain Lines ........................................... 10
9 Ductwork .................................................................... 11
9.1 Return Ductwork .................................................... 11
10 Return Air Filters ..................................................... 11
11 Electric Heat ............................................................. 11
12 Electrical and Control Wiring ................................. 12
12.1 Building Electrical Service Inspection .................. 12
12.2 Wire Sizing .......................................................... 12
12.3 Maximum Overcurrent Protection (MOP) ............ 12
12.4 Electrical Connections – Supply Voltage ............. 13
12.4.1 Air Handler Only (Non-Heat Kit Models) ........... 13
12.4.2 Air Handler - Non-Circuit Breaker Heat Kits ..... 13

























WARNING
RECOGNIZE THIS SYMBOL
AS A SAFETY PRECAUTION

WARNING
Question and Answer IconNeed help?

Do you have a question about the Daikin AMST42CU1400AA and is the answer not in the manual?

Summary

Important Safety Instructions

Pre-Installation Considerations

5.1 Preparation

Read all instructions and gather necessary tools and supplies.

5.2 System Matches

Ensure system components are manufacturer approved and AHRI listed.

Installation Location

6.1 Upflow Installation

Steps for upflow installation, including removing panels and coil assembly.

6.2 Horizontal Left Installation

Install unit in horizontal left orientation as shipped.

6.3 Horizontal Right Installation; Downflow Installation

Procedures for horizontal right and downflow installations.

Refrigerant Lines

7.3 Tubing Connections

Procedures for connecting refrigerant tubing using TXV.

7.4 Thermal Expansion Valve System Adjustment

Guidelines for checking and adjusting TXV for superheat and subcooling.

Condensate Drain Lines

Ductwork

Electric Heat

Electrical and Control Wiring

12.4 Electrical Connections - Supply Voltage

Connect supply voltage conductors through knockouts using copper wire.

12.5 Low Voltage Connections

Connect 24V control voltage to thermostat and condenser using copper wire.

12.6 Speed Tap Adjustment

Adjust blower motor speed by changing 24 VAC leads to terminal block.

Start-Up Procedure

Wiring Diagrams

Start-Up Checklist

Summary

Important Safety Instructions

Pre-Installation Considerations

5.1 Preparation

Read all instructions and gather necessary tools and supplies.

5.2 System Matches

Ensure system components are manufacturer approved and AHRI listed.

Installation Location

6.1 Upflow Installation

Steps for upflow installation, including removing panels and coil assembly.

6.2 Horizontal Left Installation

Install unit in horizontal left orientation as shipped.

6.3 Horizontal Right Installation; Downflow Installation

Procedures for horizontal right and downflow installations.

Refrigerant Lines

7.3 Tubing Connections

Procedures for connecting refrigerant tubing using TXV.

7.4 Thermal Expansion Valve System Adjustment

Guidelines for checking and adjusting TXV for superheat and subcooling.

Condensate Drain Lines

Ductwork

Electric Heat

Electrical and Control Wiring

12.4 Electrical Connections - Supply Voltage

Connect supply voltage conductors through knockouts using copper wire.

12.5 Low Voltage Connections

Connect 24V control voltage to thermostat and condenser using copper wire.

12.6 Speed Tap Adjustment

Adjust blower motor speed by changing 24 VAC leads to terminal block.

Start-Up Procedure

Wiring Diagrams

Start-Up Checklist

Daikin AMST42CU1400AA Specifications

General IconGeneral
Cooling Capacity42, 000 BTU/h
Airflow1, 400 CFM
Voltage208/230V
Phase1
Sound Level45 dB

Related product manuals