EasyManua.ls Logo

Daikin DPS028A - Page 8

Daikin DPS028A
122 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 3: Roof Curb Assembly (DPS 007–015)
1
A
F
D
B
C
E
A
E
RETURN
AIR
SUPPLY
AIR
FRONT SIDE
RIGHT SIDE
BACK SIDE
LEFT SIDE
NOTE: 1. Check submittal drawing for gas/water/electrical/supply/return air opening
Horizontal above the roof gas connection only
Standard Roof Curb – Medium Cabinet
DPS 007–012 Roofcurb with ERW Certi ed Drawing
McQuay International certi es that its equipment will conform to this drawing and McQuay’s
published speci cations, subject to its published warranty. Purchaser must determine that the
equipment is t and suf cient for the job speci cations. No change to this drawing may be made
unless approved in writing by McQuay. www.DaikinMcQuay.com © 2012 McQuay International
Model: DPS
Date:
Unit Tag:
Units: Sheet: __ of __
Curb Detail
A–A
24"
Nailer
A A
2.0"
Typ.
4.0"
14.0"
or
24.0"
34.88
Inside
48.38
Inside
81.5
Inside
13.5
Inside
30.5
Inside
Supply
Opening
Return
Opening
Electrical
Entrance
24.25
2.0
3.4
6.9
8.8
Roof Curb for ERW – Medium Cabinet
DPS 007–012 Roofcurb with ERW Certi ed Drawing
McQuay International certi es that its equipment will conform to this drawing and McQuay’s
published speci cations, subject to its published warranty. Purchaser must determine that the
equipment is t and suf cient for the job speci cations. No change to this drawing may be made
unless approved in writing by McQuay. www.DaikinMcQuay.com © 2012 McQuay International
Model: DPS
Date:
Unit Tag:
Units: Sheet: __ of __
Curb Detail
A–A
24"
Nailer
A A
2.0"
Typ.
4.0"
14.0"
or
24.0"
34.88
Inside
48.38
Inside
101.5
Inside
13.5
Inside
30.5
Inside
Supply
Opening
Return
Opening
Electrical
Entrance
20.0
24.25
2.0
3.4
6.9
8.8
IM 1125-7 • REBEL ROOFTOPS 8 www.DaikinApplied.com
MeChanICal InsTallaTIon

Table of Contents

Related product manuals