EasyManua.ls Logo

Daikin FBQ50D - Page 107

Daikin FBQ50D
215 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ESIE15-13C Emergency Operation
Field Setting 93
Operation by the Test Operation Mode
As test run by the test operation mode, there are two methods as shown below.
<Test Operation by Wireless Remote Controller>
1. Press the Inspection / Test Operation button 4 times.
2. When you press the [ON / OFF] button after setting the test run mode, the test run starts.
<Test Operation by Outdoor Unit PCB>
1. Press the Test Operation (BS4) button on outdoor unit PCB for 5 seconds. After a while, the
test operation starts.
(Reference)
For the initial operation after installation of the unit, forced cooling operation continues for
three minutes.
For the second operation and afterwards after installation, the unit forcibly operates for 30
minutes in the set mode.
Normal Test operation mode
Press the Inspection / Test
Operation button 4 times.

Table of Contents

Related product manuals