Installation manual
9
FCQ35~140C7VEB + FCQH71~140C7VEB
Split System air conditioners
4PW31577-1B
5 Press Inspection/Test Operation button 4 times
(2 times for wireless remote controller) and operate at Test
Operation mode for 3 minutes.
6 Push air flow direction adjust button to make sure
the unit is in operation.
7 Press Inspection/Test Operation button and operate
normally.
8 Confirm function of unit according to the operation manual.
Test operation before installing decoration panel (See "Notes" on
page 10)
1 Open the gas side stop valve.
2 Open the liquid side stop valve.
3 Electrify crank case heater for 6 hours.
4 Set to cooling operation with the wired remote controller and
start operation by pushing ON/OFF button.
5 Press Inspection/Test Operation button 4 times and
operate at Test Operation mode for 3 minutes.
6 Press Inspection/Test Operation button and operate
normally.
7 Confirm function of unit according to the operation manual.
8 Turn off the main power supply after operation.
Precautions
1 In case something is wrong with the unit and it does not operate,
refer to the installation manual attached to the outdoor unit or
contact your dealer.
2 Refer to the installation manual attached to the outdoor unit in
case of Individual Operation System type.
3 Conduct test operation after installing decoration panel if the
wireless remote controller is used.
NOTES
NOTE
Do not touch the drain pump, this may cause electrical
shock.
/TEST
SWING
/TEST
/TEST
/TEST