EasyManua.ls Logo

Daikin FFQ60B9V1B - Removal of Compressor

Daikin FFQ60B9V1B
462 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Outdoor Unit: 80/90 Class SiBE121135
402 Removal Procedure
2.7 Removal of Compressor
Procedure Warning Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Step
Procedure Points
1
Remove the terminal
cover.
2
Disconnect the
compressor lead wires.
U : red, V : yellow, W : blue
3
Remove the overload
protector.
4
Remove the 3 nuts. Disconnect the pipings,
referring to page 366.
(R6466)
Terminal
cover
(R9471)
W(blue)
U(red)
Overload
protector
V(yellow)
(R10440)

Table of Contents

Other manuals for Daikin FFQ60B9V1B

Related product manuals