EasyManua.ls Logo

Daikin FTK25BVMB - Page 65

Daikin FTK25BVMB
201 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Control Specification SiBE04-302
56 Function and Control
3.12.7 Control when frequency is changed
When the target discharge pipe temperature control is active, if the target frequency is changed
for a specified value in a certain time period, cancel the target discharge pipe temperature
control and change the target opening of the electronic expansion valve according to the shift.
3.12.8 Target Discharge Pipe Temperature Control
Obtain the target discharge pipe temperature from the indoor and outdoor heat exchanger
temperature, and adjust the electronic expansion valve opening so that the actual discharge
pipe temperature become close to that temperature. (Indirect SH control using the discharge
pipe temperature)
Determine a correction value of the electronic expansion valve compensation and drive it
according to the deflection of the target discharge temperature and actual discharge
temperature, and the discharge temperature variation by the 20 sec.

Table of Contents

Other manuals for Daikin FTK25BVMB

Related product manuals