EasyManua.ls Logo

Daikin FTKS25CVMB - Removal of Sound Insulation

Daikin FTKS25CVMB
298 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Si12-411A Outdoor Unit (50 / 52 / 58 / 68 / 75 Class)
Removal Procedure 251
2.5 Removal of Sound Insulation
Procedure Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure Points
1
Remove 5 screws of
the right side panel.
2
Remove 2 screws of
the partition board, and
remove the board.
3
Remove the noise
insulation (top, outer
and inner).

Table of Contents

Other manuals for Daikin FTKS25CVMB

Related product manuals