EasyManua.ls Logo

Daikin FTV35AV1 User Manual

Daikin FTV35AV1
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
R22 Split Series
MODEL
FTV25AV1
FTV35AV1
FTV50AV1
FTV60AV1
RV25AV1
RV35AV1
RV50AV1
RV60AV1
OWNER'S MANUAL
Question and Answer IconNeed help?

Do you have a question about the Daikin FTV35AV1 and is the answer not in the manual?

Daikin FTV35AV1 Specifications

General IconGeneral
Cooling Capacity3.5 kW
Heating Capacity4.0 kW
Energy Efficiency Ratio (EER)3.21
RefrigerantR32
Power Supply220-240V / 50Hz
TypeSplit System Air Conditioner

Summary

Safety Precautions

General Safety Warnings

Details critical safety warnings related to installation, electrical work, and refrigerant handling.

Installation Dimension Diagram

Selection of Installation Location

Requirements for Electric Connection

Electrical Safety Precautions

Outlines essential safety measures for electrical connections, including regulations and circuit breakers.

Grounding Requirements

Details the importance and method of proper grounding for electrical safety.

Installation of Indoor Unit

Step One: Choosing Installation Location

Guides on selecting the appropriate location for the indoor unit based on client confirmation.

Step Four: Outlet Pipe

Explains how to route the refrigerant pipes from the indoor unit, including cutting holes.

Step Six: Install Drain Hose

Instructions for connecting and insulating the drain hose for condensate removal.

Step Seven: Connect Wire of Indoor Unit (continued)

Continues instructions for connecting indoor unit wiring, including notes on wire length and circuit breakers.

Step Eight: Bind Up Pipe

Guides on bundling the refrigerant pipes, power cord, and drain hose together.

Step Two: Install Wall-Mounting Frame

Provides instructions for securely mounting the wall-mounting frame for the indoor unit.

Step Five: Connect Pipe of Indoor Unit

Guides on connecting the refrigerant pipes to the indoor unit using union nuts and torque wrench.

Step Seven: Connect Wire of Indoor Unit

Details on connecting the power and control wires to the indoor unit's wiring board.

Step Nine: Hang the Indoor Unit

Instructions for securely hanging the indoor unit onto the wall-mounting frame.

Step Three: Open Piping Hole

Details on drilling and angling the wall opening for refrigerant piping.

Installation of Outdoor Unit

Step One: Fix the Support of Outdoor Unit

Details on selecting and securely fixing the support structure for the outdoor unit.

Step Three: Fix Outdoor Unit

Steps for placing and bolting the outdoor unit onto its support.

Vacuum Pumping

Leakage Detection

Check After Installation

Test Operation

Configuration of Connection Pipe

Pipe Expanding Method

Buttons on Remote Controller

Introduction to Buttons on Remote Controller

Cleaning and Maintenance

Malfunction Analysis

Wiring

Related product manuals