EasyManua.ls Logo

Daikin FTXA25B2V1BB - Before Operation; Initial Setup and Clock Setting; Display, Power, and Position Settings

Daikin FTXA25B2V1BB
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 | Before operation
User reference guide
14
CTXA15+FTXA25~50(A)(B)2V1B(W)(S)(T)(B)
Daikin room air conditioner
4P518786-1F – 2020.05
4 Before operation
4.1 Overview: Before operation
This chapter describes what you have to do before operating the unit.
Typical workflow
Before operation usually consist of the following stages:
Fixing the user interface to the wall.
Inserting the batteries in the user interface.
Setting the brightness of the user interface display.
Setting the clock.
Setting the indoor unit position.
Turning on the power supply.
4.2 To fix the user interface to the wall
cba
a User interface
b Screws (field supply)
c User interface holder
1 Choose a place where the signals reach the unit.
2 Attach the holder with screws to the wall or a similar location.
3 Hang the user interface on the user interface holder.
4.3 To insert the batteries
The batteries will last for about 1 year.
1 Remove the front cover.
2 Insert both batteries at once.
3 Put back the front cover.

Table of Contents

Other manuals for Daikin FTXA25B2V1BB

Related product manuals