EasyManua.ls Logo

Daikin FTXF25C5V1B - To Perform a Test Run in Winter Season; Disposal

Daikin FTXF25C5V1B
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11 Disposal
Installation Manual
14
FTXF20~42C5V1B
Daikin room air conditioners
3P519299-9X – 2020.12
10.3.1 To perform a test run in winter season
When operating the air conditioner in Cooling mode in winter, set it
to test run operation using the following method.
INFORMATION
Some of the functions CANNOT be used in the test run
operation mode.
If a power failure occurs during operation, the system automatically
restarts immediately after power is restored.
For FTXF, ATXF, CTXF units
1 Press to switch the system on.
2 Press the centre of , , and simultaneously.
3 Press twice.
Result: will appear on the display. Test run operation is
selected. Test run operation will stop automatically after about
30minutes.
4 To stop operation, press .
11 Disposal
NOTICE
Do NOT try to dismantle the system yourself: dismantling
of the system, treatment of the refrigerant, oil and other
parts MUST comply with applicable legislation. Units
MUST be treated at a specialised treatment facility for
reuse, recycling and recovery.

Table of Contents

Other manuals for Daikin FTXF25C5V1B

Related product manuals