EasyManua.ls Logo

Daikin FTXF25D5V1B - Before Operation

Daikin FTXF25D5V1B
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 | Before operation
User reference guide
15
FTXF20~42D5V1B + ATXF20~42D5V1B
Daikin room air conditioners
4D520466-13G – 2021.12
4 Before operation
4.1 Overview: Before operation
This chapter describes what you have to do before operating the unit.
Typical workflow
Before operation usually consist of the following stages:
Inserting the batteries in the user interface.
Fixing the user interface to the wall.
Turning on the power supply.
4.2 To mount the user interface holder
b ca
a User interface
b Screws (field supply)
c User interface holder
1 Choose a place where the signals reach the unit.
2 Attach the holder with screws to the wall or a similar location.
3 Hang the user interface on the user interface holder.
4.3 To insert the batteries
The batteries will last for about 1 year.
1 Remove the back cover.
2 Insert both batteries at once.
3 Put the cover back.
2
3
1
AAA.LR03

Table of Contents

Other manuals for Daikin FTXF25D5V1B

Related product manuals