EasyManua.ls Logo

Daikin FTXN12NMVJU - Preparation Before Operation; Inserting Batteries; Mounting Remote Controller Holder; Fahrenheit;Celsius Display Switch

Daikin FTXN12NMVJU
26 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10English
2-2� Selection of copper and heat insulation materials
Whenusingcommercialcopperpipesandttings,observethefollowing:
• Insulationmaterial:Polyethylenefoam
Heattransferrate:0.041to0.052W/mK(0.024to0.030Btu/fth°F(0.035to
0.045kcal/mh°C))
BesuretouseinsulationthatisdesignedforusewithHVACSystems.
• ACRCopperonly.
Gas pipe
Liquid pipe
Gas pipe
insulation
Liquid pipe
insulation
Finishing tape
Drain hose
Inter-unit wire
• Besuretoinsulateboththegasandliquidpipingandobservetheinsulation
dimensionsasbelow.
Gas side
Piping size
O.D. 3/8 inch
(9.5mm)
O.D. 1/2 inch
(12.7mm)
O.D. 5/8 inch
(15.9mm)
O.D. 1/4 inch
(6.4mm)
1-3/16 inch (30mm)
or more
1-9/16 inch (40mm)
or more
1-15/16 inch (50mm)
or more
1-3/16 inch (30mm)
or more
0.031 inch (0.8mm)
(C1220T-O)
0.039 inch (1.0mm)
(C1220T-O)
0.031 inch (0.8mm)
(C1220T-O)
I.D. 15/32-19/32 inch
(12-15mm)
I.D. 9/16-5/8 inch
(14-16mm)
I.D. 5/8-13/16 inch
(16-20mm)
I.D. 5/16-13/32 inch
(8-10mm)
13/32 inch
(10mm) Min.
Minimum bend radius Piping thickness Thermal insulation size
Thermal insulation
thickness
Liquid side
• Useseparatethermalinsulationpipesforgasandliquidrefrigerantpipes.
Installation Tips
1 Removing and installing the front panel
• Removal method
1)Placeyourngersintheindentationsonthemainunit(oneeachon
theleftandrightsides),andopenthefrontpaneluntilitstops.
Indentations on
the main unit
2)Whilepushingtheleftsidefrontpanelshaftoutward,pushupthe
frontpanelandremoveit.(Removetherightsidefrontpanelshaftin
thesamemanner.)
3)Afterremovingbothfrontpanelshafts,pullthefrontpaneltoward
yourselfandremoveit.
Front panel shaft
• Installation method
Aligntheshaftofthefrontpanelwiththegroovesofgrill,andpush
allthewayin.Thencloseslowly.Pushthecenterofthelowerpanel
surfacermlytoengagethehooks.
English
01_EN_3P379970-1.indd 10 10/17/2014 12:57:25 PM

Other manuals for Daikin FTXN12NMVJU

Related product manuals