EasyManua.ls Logo

Daikin FTXN12NMVJU - Preparation Before Operation; Inserting Batteries; Mounting Remote Controller Holder; Fahrenheit;Celsius Display Switch

Daikin FTXN12NMVJU
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Si041552E PCBs / Swing Motor
Removal Procedure 9
5. PCBs / Swing Motor
Warning
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Step Procedure Points
1. Remove the control PCB.
When reassembling, fit the
projection at the back of the
terminal board into the hole
on the mounting plate.
1 Remove the screw of
the terminal board.
2 Release the earth /
ground wires and the
thermistor harness from
the slit.
3 Release the terminal
board harness from the
groove and the 3
hooks.
Terminal board
(R21839)
Mounting plate
Projection
(R21840)
Slit
Thermistor harness
Earth /
ground
wire
(R21841)
Hook
Groove
Terminal board harness
(R21842)

Other manuals for Daikin FTXN12NMVJU

Related product manuals