3 | Specific installer safety instructions
Installer and user reference guide
18
FXFA20~125A2VEB
VRV system air conditioner
4P599624-1A – 2020.06
Commisioning (see
"19Commissioning"[472]
)
WARNING
If the panels on the indoor units are not installed yet, make sure to power OFF the
system after finishing the test run. To do so, turn OFF operation via the user
interface. Do NOT stop operation by turning OFF the circuit breakers.