EasyManua.ls Logo

Daikin FXFQ20BVEB - 6 Installation; Overview: Installation; Mounting the Indoor Unit; Precautions When Mounting the Indoor Unit

Daikin FXFQ20BVEB
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 | Installation
Installer and user reference guide
24
FXFQ20~125BVEB
VRV system air conditioner
4P561452-1B – 2021.07
6 Installation
6.1 Overview: Installation
This chapter describes what you have to do and know on-site to install the system.
Typical workflow
Installation typically consists of the following stages:
1 Mounting the outdoor unit.
2 Mounting the indoor unit (+ decoration panel).
3 Connecting the refrigerant piping.
4 Checking the refrigerant piping.
5 Charging refrigerant.
6 Connecting the electrical wiring.
7 Finishing the outdoor installation.
8 Finishing the indoor installation.
INFORMATION
This chapter only describes installation instructions specific to the indoor unit. For
the other instructions, see:
The installation manual of the outdoor unit
The installation manual of the user interface
The installation manual of the decoration panel
NOTICE
After installing the decoration panel:
Make sure there is no gap between the unit body and the decoration panel.
Possible consequence: Air might leak and cause dew drop.
Make sure no oil remains on the plastic parts of the decoration panel. Possible
consequence: Degradation and damage of plastic parts.
6.2 Mounting the indoor unit
6.2.1 Precautions when mounting the indoor unit
INFORMATION
Also read the precautions and requirements in the following chapters:
General safety precautions
Preparation

Table of Contents

Other manuals for Daikin FXFQ20BVEB

Related product manuals