EasyManua.ls Logo

Daikin FXFQ20BVEB - Page 28

Daikin FXFQ20BVEB
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 | Installation
Installer and user reference guide
28
FXFQ20~125BVEB
VRV system air conditioner
4P561452-1B – 2021.07
1~1.5 m
a
a Hanging bar
O Allowed
X Not allowed
Rising piping. If necessary to make the slope possible, you can install rising
piping.
- Drain hose inclination: 0~75mm to avoid stress on the piping and to avoid air
bubbles.
- Rising piping: ≤300mm from the unit, ≤675mm perpendicular to the unit.
≤675
≤300
0~75
1000~1500
(mm)
ba
b c
a
dd
a Metal clamp (accessory)
b Drain hose (accessory)
c Rising drain piping (vinyl pipe of 25mm nominal diameter and 32mm outer
diameter) (field supply)
d Hanging bars (field supply)
Condensation. Take measures against condensation. Insulate the complete drain
piping in the building.
Combining drain pipes. You can combine drain pipes. Make sure to use drain
pipes and T-joints with a correct gauge for the operating capacity of the units.
≥100
675
(mm)
a
a T-joint
To connect the drain piping to the indoor unit
NOTICE
Incorrect connection of the drain hose might cause leaks, and damage the
installation space and surroundings.
1 Push the drain hose as far as possible over the drain pipe connection.
2 Tighten the metal clamp until the screw head is less than 4 mm from the
metal clamp part.
3 Check for water leaks (see "To check for water leaks"[429]).
4 Install the insulation piece (drain pipe).

Table of Contents

Other manuals for Daikin FXFQ20BVEB

Related product manuals