EasyManua.ls Logo

Daikin RXF35E5V1B User Manual

Daikin RXF35E5V1B
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installer reference guide
R32 split series
RXF20E5V1B
RXF25E5V1B
RXF35E5V1B
RXF42E5V1B
ARXF20E5V1B
ARXF25E5V1B
ARXF35E5V1B
ARXF42E5V1B

Table of Contents

Other manuals for Daikin RXF35E5V1B

Question and Answer IconNeed help?

Do you have a question about the Daikin RXF35E5V1B and is the answer not in the manual?

Daikin RXF35E5V1B Specifications

General IconGeneral
CategoryAir Conditioner
ModelRXF35E5V1B
TypeSplit System
Cooling Capacity3.5 kW
Heating Capacity4.0 kW
Energy Efficiency Ratio (EER)3.21
Seasonal Energy Efficiency Ratio (SEER)6.1
Power Supply220-240V, 50Hz
RefrigerantR32
Outdoor Unit Weight30 kg

Summary

General Safety Precautions

Refrigerant Safety

Safety guidelines and warnings related to the handling and charging of R32 refrigerant.

Electrical Safety

Precautions and warnings for safe electrical wiring and connections.

Specific Installer Safety Instructions

Refrigerant Piping Safety

Precautions for connecting refrigerant piping, including flaring and material handling.

Refrigerant Charging Safety

Guidelines for safely charging refrigerant, including warnings about flammability and ventilation.

Electrical Installation Safety

Ensuring electrical installations comply with regulations and avoiding electrical hazards.

Electrical Installation Safety (Continued)

Further electrical safety precautions, including wiring, grounding, and component handling.

Unit Installation

Piping Installation

Refrigerant Piping Requirements

Specifies material, diameter, and thickness requirements for refrigerant piping.

Connecting Refrigerant Piping

Provides typical workflow and precautions for connecting refrigerant piping.

Flaring Pipe Ends

Instructions and cautions for correctly flaring the ends of refrigerant pipes.

Using Stop Valves and Service Ports

Guidelines for operating stop valves and handling service ports on the unit.

Checking the Refrigerant Piping

Procedures for leak testing and vacuum drying of the refrigerant piping.

Charging Refrigerant

Steps for charging additional or complete refrigerant, including necessary labels.

Electrical Installation

Connecting Electrical Wiring

Steps and safety measures for connecting electrical wiring to the units.

Finishing the Outdoor Unit Installation

Commissioning

Commissioning Precautions

Safety warnings and precautions to observe during the commissioning process.

Performing a Test Run

Procedure for conducting a test run to verify system functionality.

Hand-over to the User

Maintenance and Service

Maintenance Safety Precautions

Safety measures and warnings to follow before performing maintenance or service.

Troubleshooting

Troubleshooting Precautions

Safety guidelines and general checks to perform before troubleshooting.

Disposal

Technical Data

Wiring Diagram and Legend

Presents the unified wiring diagram legend and specifications for components.