6 | Unit installation
Installer reference guide
30
RXTM30+40N2V1B + RXTP25+35N2V1B9 + RXTP25+35N2V1B8 +
ARXTP25+35N2V1B + RXTA30N2V1B
R32 split series
4P518023-7H – 2020.08
6.3.2 Precautions when mounting the outdoor unit
INFORMATION
Also read the precautions and requirements in the following chapters:
"2General safety precautions"[45]
"6.1Preparing the installation site"[425]
6.3.3 To provide the installation structure
Check the strength and level of the installation ground so that the unit will not
cause any operating vibration or noise.
Use a vibration-proof rubber (field supply) in cases where vibrations may be
transmitted to the building.
Fix the unit securely by means of foundation bolts in accordance with the
foundation drawing.
Prepare 4 sets of M8 or M10 anchor bolts, nuts and washers (field supply).
20 mm
330
524
211
(mm)
211
a
a 100mm above expected level of snow

Table of Contents

Other manuals for Daikin RXTP25N2V1B8

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Daikin RXTP25N2V1B8 and is the answer not in the manual?

Daikin RXTP25N2V1B8 Specifications

General IconGeneral
BrandDaikin
ModelRXTP25N2V1B8
CategoryAir Conditioner
LanguageEnglish

Related product manuals