EasyManua.ls Logo

Daikin VRV III - 6 System Architecture

Daikin VRV III
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
VRV Systems Network Solution
28
6 System Architecture
6 - 1 Requirement spec and the recommendation of other equipment
Requirement Specifications Recommendations Remarks
PC 1
[Hardware]
CPU : Pentium 500MHz or above recommended
Memory: 256MB or above
HDD: 4GB minimum, 8GB or above
Keybord/Mouse
Network: 100Base/T Ethernet
SVGA (800 x 600, 1,024 x 768, 1,280 x 1,024)
Monitor (15’,17’)
Sound & Speaker
We recommend makers such as IBM, Compaq
or Dell, etc.
In the case of an alternative maker, correct
operation should be checked before shipment.
[Software]
Windows XP (Professional SP2 or later), Windows 2000 (Professional
SP4 or later)
Microsoft Excel 2000
[Other equip.]
The intelligent Manager is executing on the
English version.
The Windows NT 2 bytes encoded characters
(Chinese, etc.) are not supported.
2
LBP (not indispensable.)
- It must be supported by Windows NT.
- Require A4 size paper
We recommend makers such as HP, Canon,
etc.
UPS 3
Capacity: 200-250 W / 20 min
Voltage: as required on the field
APC
SU 700, SU 1000 Series
4
Control Signals
- Power failure signal (from UPS)
- UPS shutdown signal (to UPS)
+ Relay I/O
module (AP9610)
5
AC power lines
NETWORK
EQUIP.
6
Multi-port HUB (4 or more ports)
10 Base/T cables (category 5)
We recommend makers such as 3 com, etc. Hub should be used even when one iPU is
connected to PC.
7
A required distance and a number The cable for networks is required.
MODEM 8a
33.6 kbps communication speed and reception function are required. We recommend makers such as 3 com, etc. Required for remote monitoring. However, we
recommend it to be included as a standard.
8b
Air Conditioning Network Service System
WHM 9
1pulse / 1kWh output is required. As specified in the D-BACS system design
guide.
Required for powerproportional-division.
10
WHM - iPU connection cable
OTHER 11
D3 network cables As specified in the D-BACS system design
guide.
HUB
UPS
Indoor
Unit
Indoor
Unit
1
2
3
6
7
4
5
AC
8a
9
11
iPU
(Provided from DIL)
System Diagram
Outdoor
Unit
WHM
Modem
10
8b
Modem

Other manuals for Daikin VRV III

Related product manuals