EasyManua.ls Logo

Daikin VRV Series - Installation of the Decoration Panel

Daikin VRV Series
27 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23
3P184443-12N English
9-3 CONTROL BY 2 REMOTE CONTROLLERS (CONTROLLING 1 INDOOR UNIT BY 2
REMOTE CONTROLLERS)
When using 2 remote controllers, one must be set to “MAIN” and the other to “SUB”.
Wiring Method (See 8. ELECTRIC WIRING WORK)
(1) Remove the control box cover.
(2) Add remote controller 2 to the terminal block for remote controller (P
1, P2) in the control box. (There is
no polarity.) (Refer to Fig.30 and Table 8-3)
9-4 EXTERNAL REMOTE CONTROL (FORCED OFF AND ON/OFF OPERATION)
(1) Wire specications and how to perform wiring
Connect the input from outside to terminals T1 and T2 of the terminal block for remote controller.
Input A
FORCED
OFF
T2T1F2
Wire specication Sheathed vinyl wiring or cable (2 wire)
Gauge AWG 18-16
Length Max. 328 ft.
External terminal
Contact that can ensure the minimum applicable
load of 15V DC, 1 mA.
(2) Actuation
The following table explains FORCED OFF and ON/OFF OPERATIONS in response to input A.
FORCED OFF ON/OFF OPERATION
Input ON stops operation (impossible by remote controllers).
Input OFF ON turns ON unit.
Input OFF enables control by remote controller
Input ON OFF turns OFF unit.
(3) How to select FORCED OFF and ON/OFF OPERATION
Turn the power on and then use the remote controller to select operation.
9-5 CENTRALIZED CONTROL
For centralized control, it is necessary to designate the group No. For details, refer to the manual of
each optional controller for centralized control.
10. INSTALLATION OF THE DECORATION PANEL
Caution:
Withawirelessremotecontroller,eldsettingandtestruncannotbeperformedwithoutattaching
the decoration panel.
<Read 12. TEST RUN before making a test run without attaching the decorated panels.>
Refer to the installation manual attached to the decoration panel.
After installing the decoration panel, ensure that there is no space between the unit body and decoration
panel.

Other manuals for Daikin VRV Series

Related product manuals