EasyManua.ls Logo

Danby DKC645BLS - Setting up Your Chill N Tap

Danby DKC645BLS
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SETTING
UP
YOUR
CHILL
TAP
ASSEMBLY
INSTRUCTION:
1.
Installation
of
Top
Rail:
(as
show
in
Fig
1).
2.
Installation
of
CO,
Cylinder
Support:
Install
the
cylinder
‘Support
onto
the
four
studs
located
on
the
exterior
back
wall
of
the
cabinet.
(no
tools
required)
Ау
the
cylinder
support
with
ће
studs
and
push
down
emy.
See
Fig.
2
з.
Installation
of
CO,
Cylinder:
Install
your
*
Алу
charged
Со;
cylinder
into
the
support
stand.
IMPORTANT
NOTICE:
ALWAYS
EXERCISE
EXTREME
CAUTION
WHEN
HANDLING
PRESSURIZED
Со;
CYLINDERS,
4.
Installation
of
СО;
Regulator:
Atach
the
СО;
Regulator
to
the
СО
cylinder
by
scrowing
the
regui
valva
and
tighten
(snug)
using
an
adjustable
wrench.
Soe
Fig.
3
10

Related product manuals