EasyManua.ls Logo

Danby DKC645BLS - Page 15

Danby DKC645BLS
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TING
INSTRUCTIONS
an
Emply
Close
the
main
cylinder
valve
(A)
by
tuming
in
a
clockwise
drecton.
See
Fig
11
Close
the
secondary
shut-off
valve
(C)
by
turning
to
orizontal"
(eastwest)
postion
on
lower
stom
pipe,
See
Fig.
Remove
the
air
ine
clamp
and
hose
from
the
regulator
Remove
tho
regulator
assembly
(E)
tram
empty
cylinder
See
Fig.11
Remove
dust
cap
from
new
andor
placement
CO;
cylinder
Ro-attach
regulator
assembly
(E)
to
mewireplacomont
cyindar
See
Fig
11
Re-attach
the
air
line
hoso
to
regulator
(barb.
connection)
and
secure
with
clamp.
Slowly
open
main
valve
(A)
all
the
way.
See
Fig.
11
15
9.
Readpst
regulator
pressure
(D)
(f
necessary)
between
10
~
12
pais,
10.
Open
the
secondary
shut-off
valve
(C]oy
turing
to
"vertical"
(nonnisoutn)
positon
on
lower
stem
po
*
Pror
to
tapping
the
keg,
ensure
the
beer
faucet
is
in
the
off
position.
+
Completely
remove
the
Gust
cover
(бепібсабоп
cap)
from
the
beer
keg.
+
Check
that
the
keg
coupler
(handle)
is
in
the
up
(of
position.
See
Fig.
7
-
insert
the
keg
coupler
into
the
locking
neck
of
the
beer
Kag
and
apply
a
tum
clockwise
to
lock
into
positon
+
РШ
keg
coupler
handie
out
and
downward
unt
f
locks
into
postion.
See
Fig.
8
This
activates
both
the
beer
and
(CO2)
pressure
ine.
The
keg
is
now
tapped
and
ready
to
draw
beer.

Related product manuals