Termix VX-IV - 3 Series DS Fully insulated
Pre hand over check list
9
38
9
7
14
20
26
31
69
M
A
48
10
41B
4
48
Description: Pos. Page OK Remark:
Connection connected correctly 10
All connections tightened
Primary system ushed, through ushing bypass
2 Strainers checked 9 18
Dierential pressure controller adjusted 31 20
Clip on actuator removed 69 20
Wiring completed 14-15
Mains connected
Room controller connected and working
Pre payment unit connected and working
Pump setting completed 10 20-21
Correct pressure on secondary system 26 17
System properly vented 48 18
UFH stat mounted correctly on heating supply line 60 22
Safety valve checked and piped to drain 4 22
Heating temperature setting 7 19
Flushing bypass closed
Insulation has been remounted
Date: Unit No.: Carried out by: