EasyManua.ls Logo

ddtop ULG - Cleaning; Assembly; Product Certification

Default Icon
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15 / 16
WWW.DDTOP.COM
9.3 清洗
9.3 Cleaning
9.3.1 仔细清洗密封面,使其表面干净无杂物,划伤;
9.3.1 Carefully clean the sealing surface to make it clean and free from sundries and scratches;
9.4 组装
9.4 Assembly
9.4.1 将石英玻璃管装入壳体内,玻璃管的端面与壳体的端面基本一致;
9.4.1 Load the quartz glass tube into the shell, and the end face of the glass tube is basically the
same as that of the shell;
9.4.2 将石墨填料环套入石英玻璃管的两端;
9.4.2 Insert graphite packing ring into both ends of quartz glass tube;
9.4.3 安装压紧体,对角线方向旋紧内六角螺栓;
9.4.3 Install the compression body and tighten the hexagon bolts diagonally;
9.4.4 按最高工作压力的 1.5 倍水压测试,保压 3 分钟不泄漏。
9.4.4 According to 1.5 times of the maximum working pressure of water pressure test, keep pressure
for 3 minutes without leakage.
10 产品认证
10 Product Certification

Related product manuals