EasyManua.ls Logo

Dean SCFD - Page 35

Dean SCFD
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DECATHLON (D & HD) SERIES GAS FRYERS
CHAPTER 6: INSTALLATION AND OPERATION
6-5
6.2.2 Assembling the Filter (cont.)
4. Sprinkle 8 ounces (227g) of filter powder on
the filter sheet. Ensure the powder covers the
filter paper evenly.
5. Place the crumb screen in the filter pan.
Allow the crumb screen to rest on the top
edges of the hold-down ring.
6. Place filter pan cover onto the filter pan
assembly. Ensure the pickup tube is properly
positioned in the pan lid access hole.
Sprinkle the proper amount of filter powder evenly
over the paper.
Crumb screen properly placed.
Fully assembled pan with pickup tube properly
positioned in pan lid access hole. Position may
vary between models.

Other manuals for Dean SCFD

Related product manuals