EasyManua.ls Logo

Dekko FPI-DECK20SQ - Section 4. Natural Gas and Propane Connections; Section 5. Completing the Installation Process

Default Icon
17 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
1915 Setterington Drive
Kingsville • Ontario
Canada • N9Y 2E5
Section 4.
Natural Gas and Propane Connections
Our fire features arrive pre-assembled with the burner and key valve intact.
Please refer to the burner manufacturer’s instruction manual included in your delivery for
instructions regarding installation, clearances and operation.
Each of our fire pits are built with air-flow openings that comply with ventilation requirements.
PLEASE NOTE:
VENTILATION AREAS MUST REMAIN OPEN AND UNBLOCKED
Ventilation openings may be used to accommodate running a gas line.
Note regarding ELEMENT and SERENADE fire features:
If the gas line needs to be placed in a different location, a hole can be drilled in the fire pit using
a 1” paddle bit. After removing the burner, drill the hole from the inside of the fire pit.
Section 5.
Completing the Installation Process
After the gas connections are complete in accordance with the burner manufacturer’s instruction
manual, insert burner tray into position on your fire pit.
AVOID covering the burner holes as much as possible when arranging Lava Rock or Decorative
Stone on your fire feature:
Lava Rock
Ø Use the provided lava rock and place directly on top of the burner’s surface; the
lava rock aggregate must be placed on the burner before the decorative stone.
Decorative Stone
Ø Once the lava rock is in place, distribute beach stone or crushed glass over the
entire surface area and cover all lava rock.