EasyManua.ls Logo

Delfield Specification Line GAR2P-S - Review

Delfield Specification Line GAR2P-S
104 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Part Number GA_SM 08/18 63
Section 8 Refrigeration
Service Procedures
Lokring fittings should be used to seal refrigeration lines
on R-290 systems.
Tool part numbers and quantities of Lokring parts
necessary to service R-290 systems are as follows:
Qty Part # Description Notes
1 L13003829 Hand tool with double
hinge handles
2 L20000200 Assembly Jaw-Hand Tool
MB8
1 L14000878 Lok Prep 15ml Good for 1 yr.
12 L13000766 Brass end caps .25 Use 2 per cap
Phone numbers to order parts: PA. 800-304-0153 and FL.
877-861-0955
To purchase from other vendors reference # WX5X1 for
Lokring tool.
Review
Its advisable to use portable gas detectors when
working on R-290 units
Before soldering on a R-290 system technicians should
evacuated and purged with nitrogen twice
Maximum allowable non-condensable in a R-290 system
is 1%
Evacuate the unit to a minimum of 500 microns before
charging
Bubble leak test or gas detection leak testing are the
two preferred methods
R-290 should be charged in the liquid state
R-290 charges are typically 40% to 50% that of
fluorocarbon refrigerants
R-290 operating pressures compare to that of R-22
Be sure to ground the unit before servicing refrigeration
system
Operate the condensing unit for a minimum of 5
minutes before evacuating to allow oil and refrigerant
to separate
Propane detectors should always be used when
servicing R-290 equipment
Reclaim and purge system twice before servicing unit
Always cut components and fittings out of system –
never use a torch to remove components
Never leave any type of access fittings on R-290 system
– always permanently seal the system

Table of Contents

Related product manuals