12 PowerConnect B-Series FCX/FCXS Getting Started Guide
53-1002049-01
• Mechanical loading: Do not place any equipment on top of a rack-mounted unit.
• Circuit overloading: Be sure that the supply circuit to the rack assembly is not overloaded.
• Grounding: Rack-mounted equipment should be properly grounded. Particular attention should be given to
supply connections other than direct connections to the mains.
Use the following steps to mount devices in rack.
1. Remove the rack mount kit from the shipping carton. The kit contains two L-shaped mounting brackets and
mounting screws.
2. Attach the mounting brackets to the sides of the device as illustrated in Figure 4 and Figure 5.
B-FCX624-E, B-FCX624-I, B-FCX648-E, and B-FCX648-I device brackets are mounted using three screws, as shown in
Figure 5.
FIGURE 4 Attaching the Brackets for B-FCX624S and B-FCX648S devices
TABLE 3 Operating environment
Operating Temperature Relative Humidity Operating Altitude
0° – 40° C (32° – 104° F) 5 to 95%, @ 40° C (104.9°F), non-condensing 0 – 3000 meters (10,000 feet)
TABLE 4 Storage environment specifications
Storage Temperature Storage Humidity Storage Altitude
40° to 70° C
(-40° to 158° F)
95% maximum,
non-condensing
3,000 meter (10,000 feet)
maximum