EasyManua.ls Logo

Dell PowerEdge 1950 - Replacing the Rack Doors; Installing the Tray and Cable-Management Arm (Sliding Rail Kits Only); Installing the Tray

Dell PowerEdge 1950
202 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22 Four-Post Rack Installation
Replacing the Rack Doors
See the procedures for replacing doors in the documentation provided with your rack.
CAUTION: Because of the size and weight of the rack cabinet doors, never attempt to remove or install them
by yourself.
Installing the Tray and Cable-Management Arm
(Sliding Rail Kits Only)
NOTE: This procedure does not apply to the static rail kit.
Installing the Tray
1
At the back of the system, fit the ends of the tray between the ends of the mounting rails and slide
the tray forward until it latches (see Figure 1-12).
2
In preparation for installing the cable-management arm, press the catch at the center of the cable-
management arm retention latch and rotate the latch downward (see Figure 1-12).
Figure 1-12. Installing the Tray
1 mounting rails (2) 2 tray 3 cable-management arm retention latch
1
3
back of system
2

Table of Contents

Other manuals for Dell PowerEdge 1950

Related product manuals