EasyManua.ls Logo

Dell PowerEdge 1950 - Integrated Devices Screen

Dell PowerEdge 1950
202 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
34 Two-Post Rack Installation
3
Remove the bracket and then place the bracket on either the 7.62-cm or 15.24-cm (3-inch or 6-inch)
wide flush-mount threaded studs (see Figure 2-5).
4
Using the two nuts that you removed in step 2, tighten the nuts finger tight to secure the adjustable
mounting bracket (see Figure 2-5).
5
Repeat step 2 through step 4 to configure the other mounting rail.
Figure 2-5. Configuring the Adjustable Mounting Bracket for Flush-Mount Installation
6
Holding the left mounting rail at the location you marked, position the flush-mount mounting flange
against the front of the vertical two-post rack and secure it to the two-post rail with two 12-24 x
0.5-inch pan-head Phillips screws (see Figure 2-6).
1 nuts (2 per bracket) 2 adjustable mounting bracket 3 7.62-cm (3-inch) wide, flush-
mount, threaded studs
4 flush-mount mounting flange
1
4
3
2

Table of Contents

Other manuals for Dell PowerEdge 1950

Related product manuals