EasyManua.ls Logo

Dell PowerEdge 2900 - Attaching the Cable-Management Arm Retainer; Replacing the Rack Doors

Dell PowerEdge 2900
110 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20 Rack Installation Guide
Attaching the Cable-Management Arm Retainer
The cable-management arm retainer keeps the cable-management arm in place. To attach the cable-
management arm retainer:
1
Connect the release latch on the
cable-management arm
retainer to the tab on the outer slide
assembly. See Figure 1-10.
NOTE: Attach the
cable-management arm retainer to the side opposite of where you attach the cable-management
arm (see Figure 1-10).
2
Fold the
cable-management arm
retainer until it locks into place behind the
cable-management arm.
To unlock the cable-management arm retainer:
1
Press the blue button on the
cable-management arm r
etainer while lifting the retainer arm.
2
Rotate the arm of the retainer to an open position.
Figure 1-10. Cable-Management Arm Retainer
Replacing the Rack Doors
See the procedures for replacing doors in the documentation provided with your rack cabinets.
This completes the rack installation of your system.
1 release latch on cable-
management arm retainer
2 cable-management arm retainer 3 blue button
4 metal tab
1
4
back of system
2
3

Table of Contents

Other manuals for Dell PowerEdge 2900

Related product manuals