Rack Installation Guide 15
Installing the System in the Rack
CAUTION: If you are installing more than one system, install the first system in the lowest available position
in the rack.
CAUTION: Because of the size and weight of the system, never attempt to install the system in the mounting rails
by yourself.
CAUTION: Never pull more than one system out of the rack at a time.
1
Pull the two inner slide assemblies out of the rack until they lock in the fully extended position.
2
Lift the system into position above the extended slides.
Using a minimum of two persons, each person should place one hand on the front-bottom of the
system and the other hand on the back-bottom of the system.
The three shoulder screws on each side of the system fit into the corresponding J-slots on the inner
slide assemblies (see Figure 1-7).
3
Lower the back of the system while aligning the back shoulder screws on the sides of the system
with the back J-slots on the slide assemblies.
Figure 1-7. Installing the System in the Rack
1 system locking mechanism 2 shoulder screws 3 J-slots