Chapter 7 Optional AccessoriesC2000 Plus 
 
7-101
2.  Install the conduit box by tightening the 4 screws, as shown in the following figure.   
Screw torque: 24–26 kg-cm / (20.8–22.6 Ib-in.) / (2.4–2.5 Nm) 
5
6
7
8
 
Figure 7-105   
 
3.  Install the conduit box by tightening all the screws shown in the following figure   
Screw 9–12 torque: 12–15 kg-cm / (10.4–13 Ib-in.) / (1.2–1.5 Nm) 
Screw 13–16 torque: 24–26 kg-cm / (20.8–22.6 Ib-in.) / (2.4–2.5 Nm) 
9
10
11
12
13
14
15
16
 
Figure 7-106