Verify shipment completeness and condition, reporting any damage to carrier and supplier.
Details concerning the pump's nameplate and its specific components like type and code numbers.
Comprehensive breakdown of the pump's type number and the meaning of each segment for proper identification.
Information on pump noise levels, capacity ratings, and permissible flange loads for operation.
Guidelines for securely mounting and fastening the pump onto a stable, horizontal base plate to prevent distortion.
Electrical wiring must be performed by authorized skilled personnel following current regulations and safety standards.
Procedure to access the impeller by removing the U-pipe, shaft seal cover, and bearing housing.
Steps involved in the dismantling of the impeller and the star wheel components using specific fasteners.
Instructions for the proper removal of the shaft seal assembly, including the sunk key and shaft seal cover.
Method for pressing out the seat from behind the shaft seal during disassembly.
Steps for safely removing the shaft along with its associated bearings after removing the sunk key.
Checks for wear and damage on critical pump parts like sealing rings, shaft seals, and bearings after disassembly.
Guidance on fitting the sealing ring correctly against the pump casing shoulder during assembly.
Instructions for assembling the shaft and bearings into the bearing housing, fitting the sunk key.
Steps for assembling the water deflector with the bearing housing and shaft seal cover.
Detailed procedure for installing the shaft seal, including cleaning, lubrication, and using fitting tools.
Process for fitting the star wheel, checking clearances, and installing the priming plate with O-ring.
Instructions for mounting the impeller onto the shaft and securing it with the washer and nut.
Steps for assembling the bearing housing and shaft seal cover with gasket and O-ring.
Final check to ensure the shaft rotates freely after the assembly is complete.
Pre-start checks like shaft rotation and casing filling, and the correct method for initiating pump operation.
Method for draining any remaining liquid from the pump via the drain plug after system drainage.
Details on bearing life, lubrication requirements, and when replacement is necessary due to wear or noise.
Information required, such as pump type and number, to accurately order replacement pump parts.