#Pizza Hut Make Table operating and service manual
12
5.1 Work plan Installation
The work plan of the PH models uses to be delivered disassembled. In order to start
operation, put the work plan on the top of the under counter and slip it up to the fixing
position.
Fix it by fastening the four screws to both sides:
Fill the empty space between the overlapping metal sheets on both sides with NSF sealant in
order to create a uniform joint: