OPERATION
21
2.3 Turn the Multi-switch to the “OFF” position to
shut down the engine and fuel.
2.1
2.2
2. Shutting off the generator
3. Connection Electrical Loads
3.1 Let the engine stabilize and warm up a few minutes after starting.
3.2 Prior to powering tools and equipment, make sure the generator’s rated voltage, and amperate capacity
is adequate to supply all electrical loads that the unit will power. If powering exceeds the generator’s capacity,
it may be necessary to group one or more of the tools and/or equipment for connection to a separate generator.
3.3 DO NOT connect 3-phase loads to the generator.