EasyManua.ls Logo

Diamond Bidex 500 - Step 6 System Venting; Step 7 Fitting

Diamond Bidex 500
8 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 6 System Venting
Air vent screw
Step 6 System Venting
Fill the System and vent the air from the heat exchanger using the air vent screw. Close
the vent screw ensuring that there are no leaks.
Step 7 Fitting
Ensuring that the flexible hoses do not kink and the electrical cable is not in contact with any
Ensuring
that
the
flexible
hoses
do
not
kink
and
the
electrical
cable
is
not
in
contact
with
any
hot surfaces slide the plinth heater under the cupboard until the front edge is just behind the
line of the plinth.
Replace the plinth and pull the heater through the opening till the front edge projects 8mm
through the plinth.
8mm
3