EasyManua.ls Logo

Diedrich Roasters CR Series - User Manual

Default Icon
39 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
CR Series Roasters
(CR-35, CR-70, CR-140, & CR-280)
Installation, Operation & Maintenance Manual
2020
Revision D
DIEDRICH ROASTERS, LLC
P.O. Box 430
Ponderay, Idaho 83852
Toll Free: (844) 343-3742 Fax: (208) 417-1552 Support: (888) 519-0069
Technical Support: support@diedrichroasters.com
PROPRIETARY RIGHTS NOTICE: All rights reserved. No part of this material may be reproduced or transmitted in any form or by means,
electronic, mechanical or otherwise, including photocopy and recording or in connection with any information storage or retrieval system, without
the written permission of Diedrich Roasters, LLC.
Question and Answer IconNeed help?

Do you have a question about the Diedrich Roasters CR Series and is the answer not in the manual?

Summary

Roaster Installation

Roaster Parts

Drum Retaining Collar

Critical step to remove the drum retaining collar before operating the motor.

Gas Installation

Pipe Sizing

Importance of proper gas line sizing for optimal performance and BTU rating.

Electrical Installation

Motor Rotation

Importance of checking motor rotation direction after wiring for safety.

Air Compressor Installation

Safety Shut-Off Valve

Requirement for a readily accessible safety shut-off valve in the air supply line.

Ducting

Safeguards

Operator Control Console - Manual Roaster

Initial Start-Up

Seasoning the Roasting Drum

Roasting for Consumption

Shut Down

Cleaning

Chaff Collection Cyclones

Instructions for emptying and cleaning the chaff collection cyclone barrel and interior.

Air Ducts

Importance and procedure for cleaning air ducts to prevent residue build-up and fire hazards.

Drum Shaft Bearings

Agitator Shaft Bearing

Gearbox Lubrication

Diedrich Roasters CR Series Specifications

General IconGeneral
BrandDiedrich Roasters
ModelCR Series
CategoryKitchen Appliances
LanguageEnglish

Related product manuals