EasyManua.ls Logo

Dometic F0200FT - Page 14

Dometic F0200FT
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WHEN INSTALLING AND CONNECTING THE APPLIANCE TO THE GAS SUPPLY,
ENSURE THAT THE GAS SUPPLY HOSE IS NOT TWISTED, STRETCHED OR
SUBJECTED TO ANY FORM OF STRAIN WHICH COULD CREATE A HAZARD.
CATEGORY AND COUNTRY OF DESTINATION
GAS PRESSURE
30 mbar Butane (G30)
30 mbar Propane (G31)
28-30 mbar Butane (G30)
37 mbar Propane (G31)
MODEL TOTAL NOMINAL THERMAL
CAPACITY
AIR VOLUME REQUIRED FOR
COMBUSTION
I3B/P(30)
AT BE DE DK FI GB NL NO PT SE SI
I3+ (28-30/37)
BE CH ES FR GB IE IT PT SI
FO290TD - FO290TS
FO300 - FO300L
FO390TD - FO390TS
FO211FGT - FO291TD - FO291TS
FO311 - FO391TD - FO391TS
FO457 - FO502 -VN555 - VN565
FO500 - FO501
FO200FT - FO200FTFE
1,6 KW - 116 gr/h
2,8 KW - 204 gr/h
3,2 m
3
/h
5,6 m
3
/h
1,2 KW - 87 gr/h
1,287
2,4 m
3
/h
2,

14
MAINTENANCE USE
ENGLISH
INSTALLATION
This appliance is designed for running off the following types of gas at the corresponding operating pressures. The gas
category (or categories) of the appliance is given on the specifications label affixed to the appliance.
CONNECTING TO GAS SUPPLY
CHECK THESE SPECIFICATIONS BEFORE CONNECTING THE APPLIANCE TO THE
GAS CYLINDER/BOTTLE. THE PRESSURE REGULATORS CONNECTED BETWEEN
THE GAS CYLINDER AND APPLIANCE MUST CONFORM WITH THE CATEGORIES
GIVEN IN THE TABLE BELOW.
1 Mount the flue attachment (K) and secure in place with the 2 fixture screws provided as illustrated
in FIG. 3 - PG. 128 and then proceed with connecting the ducting to the flue.
2 The roof mounted flue must be positioned vertically with a maximum inclination of 15°. Drill a 60mm hole in
the roof of the vehicle in proximity of the oven. To avoid damaging or denting the roof when installing the flue and
to ensure sealing if required mount a 1mm thickness metal plate to the wall with the hole.
3 Install the flue and from the inside of the vehicle secure in place with the nut. To guarantee the roof is sealed and
does not leak, after the oven has been on for several hours re-tightened the flue fixture nut.
4 Mount and install the ducting as illustrated in FIG. 4 - PG.129. Feed the ducting into the flue until it stops and secure
in place with a self-tapping screw.
5 Using ties secure the ducting ( 55mm) and the protective tubing ( 65mm) for their entire lengths to the walls.
COD 42 REV 4 CE - DOMETIC.indd 14 22/04/14 16.13
All manuals and user guides at all-guides.com

Related product manuals