EasyManua.ls Logo

DONPER D600 - Unpacking and Machine Setup; Crate Removal and Inspection; Final Placement and Connection

DONPER D600
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
When your Donper USA D600 is delivered, it
will
arrive in a crate. The first
thing you
will
need to do is remove the
machine from
the crate.
1. Place the crate on a flat surface.
2. Remove the lid from the crate by using a flathead screwdriver to flip up the
tabs on all four sides of the lid that attach the lid to the sides of the crate.
3. Next remove the 4 sides of the crate using the flathead screwdriver to
open up the remaining tabs.
4. Remove all packing material and inspect the D600 for any cosmetic de-
fects.
5. Review the packing list and ensure all accessories have been included in
with the machine.
6. Remove the shipping bolts mounting the D600 to the crate.
7. Place the D600 on a level surface in a location that allows adequate space
on each side of the machine for proper air ventilation. (50cm of space on
all sides)
8. Remove all contents from inside the hopper.
9. Insert the feed tubes into the feed tube opening located inside the hopper.
10. Connect the power wire to the main power supply ensuring that power
supply is sufficient for running the machine.

Related product manuals