EasyManua.ls Logo

Dover Marathon RAMJET Signature RJ-100SC User Manual

Dover Marathon RAMJET Signature RJ-100SC
47 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
OPERATION, MAINTENANCE,
AND INSTALLATION
MANUAL
FOR
RJ-88SC RJ-100SC
RJ-250SC RJ-250SC Ultra
Includes HT (Hydraulic Tailgate) Units and
SL (Streamline, Liquid Removal) Units
SELF-CONTAINED
COMPACTOR CONTAINER
Marathon Equipment Co. OMI Manual No. 0018 Rev. 1/11

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Dover Marathon RAMJET Signature RJ-100SC and is the answer not in the manual?

Dover Marathon RAMJET Signature RJ-100SC Specifications

General IconGeneral
BrandDover
ModelMarathon RAMJET Signature RJ-100SC
CategoryTrash Compactor
LanguageEnglish

Summary

Marathon Compactor Model Specifications

Pre-Operation Safety and Setup Guidelines

Control Panel and Operator Station

Operator Station Control Descriptions

Detailed explanation of each control button and switch on the operator panel.

Standard Model Operating Instructions

Manual Ram Stop and Override Procedures

Instructions for manual ram control and override functions during operation.

Automatic Mode Operation Instructions

Optional Compactor Control Features

Lock-Out and Tag-Out Safety Procedures

Periodic Maintenance Schedule and Tasks

Hydraulic Pressure Setting Procedures

Pressure Settings Chart

Table of pressure settings for different compactor models.

Compactor Principles of Operation

Tailgate Seal Replacement Procedure

Fuses and Circuit Breakers Chart

Electrical Component Charts

Typical Electrical Panel Box Configuration

PLC Layout and Component Description

PLC Maintenance: Counters and Timers

Typical Hydraulic System Schematic

Troubleshooting: Unit Operation Issues

Troubleshooting: Pump and Overload Issues

Concrete Pad Installation Requirements

Steel Installation Procedures

Electrical and Hydraulic Installation Setup

Grounding Instructions

Requirements for proper equipment grounding according to NEC.

Remote Power Pack Installation

Guidelines for installing and connecting a remote power unit.

Electrical Connections and Start-Up

Pushbutton Control Panel Wiring

Wiring and placement of remote operator stations and emergency stops.

Electrical Connections and Voltage Check

Connecting power lines and verifying voltage at the disconnect switch.

Initial Start-Up Procedures

Steps for safe and correct initial operation of the unit.

Through-the-Wall Power Unit Installation Guide

Hauler Instructions: General Handling

Hydraulic Tailgate Operation