Line Leak Status
1. Pressure icon: This shows the current pressure in the pipeline.
2. Hook icon: This changes to show to “Active” when the hook signal is in operation.
3. STP icon: This changes to show that the STP is “On” when the STP is operational.
4. Leak Test Rate: Select a Leak Test Rate from the drop-down. Click the Start button to start an On
Demand test. Click the Stop button to stop a test that has been started.
5. Test Status Idle: This shows Idle if a test is not in progress.
6. Type: This shows the type of leak test.
7. Test Results: Shows the result of the test. Possible results are: PASSED, FAILED, ABORTED
(STOPPED) and IN PROGRESS.
8. Start Time: This shows the time when the test started.
9. Running Time: This shows the total time of the test since it started.
10. Estimated Remaining Time: Approximate time until the test iscomplete.
11. Executed Cycles: The system will start and stop the STP a number of times during the test to get
pressure readings. Each start and stop sequence is considered to be a cycle. This field shows how
many cycles have been completed so far.
12. Reference Pressure: This is the reference pressure at which the test will run. A 3 gph test is
referenced at 10 psi.
13. Running Pressure: This is the pressure in the pipeline once the STP has stopped fueling.