EasyManua.ls Logo

D+H RZN 4503-T User Manual

D+H RZN 4503-T
14 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
99.823.83 1.1/11/08
© 2008 D+H Mechatronic AG, Ammersbek
Alle Maße in Millimeter. / All sizes in millimetre.
Technische Änderungen vorbehalten. /
Rights to technical modifications reserved.
D+H MechatronicAG Georg-Sasse-Str. 28-32 22949Ammersbek Tel. 40-605 65 239 Fax 40-605 65 254 D- +49 +49 www.dh-partner.com
1/12
smoke ventsmoke
vent
Instruction for use
Safety system protects human life and material assets!
Once a year functional testing by a specialist company authorized by the manufacturer.
Connection, mounting and functional testing by a
specialist company authorized by the manufacturer.
Green control diodes in the buttons must constantly be on,
otherwise see "Information for Starting".
Repair power failure at once. Emergency power supply for 72 hours.
Smoke vent button control panel RZN 4503-T
There are guarantee for all D+H products from date of verified handing over of the system
up to maximal 3 years after date of delivery, when mounting and starting has been carried out by a
D+H authorized
D+H guarantee is expired in case of connection of D+H components with external systems or
with mixing of D+H products with parts of other manufacturers.
2 years
distributor.
Guarantee

Other manuals for D+H RZN 4503-T

Question and Answer IconNeed help?

Do you have a question about the D+H RZN 4503-T and is the answer not in the manual?

D+H RZN 4503-T Specifications

General IconGeneral
BrandD+H
ModelRZN 4503-T
CategoryControl Panel
LanguageEnglish

Summary

Technical Data and Maintenance

Scheduled Maintenance Frequency

Maintenance to be performed annually by an authorized specialist company.

Required Maintenance Tests

List of essential checks during maintenance, including external examination and functional testing.

Control Panel Overview and Operation

Manual Alarm Release

Procedure for manually opening the smoke vent using the button during an alarm.

Automatic Release by Fire Detector

Process for automatic smoke vent opening triggered by a fire detector.

Automatic Release by External Control

Steps for automatic smoke vent opening initiated by an external control system.

Manual Closing After Alarm

Procedure for manually closing the smoke vent after an alarm event.

Automatic Closing by External Control

Process for automatic smoke vent closing via external control signals.

Automatic Closing After External Release

Steps for automatically closing the smoke vent after an external automatic release.

Emergency Closing Due to Power Failure

Procedure for closing the smoke vent in the event of a power failure.

Emergency Closing Due to Non-Resettable Alarm

Steps for closing the smoke vent when facing a non-resettable alarm condition.

Extended Functions and Line Management

Starting and Examination Procedures

Pre-Start Checks

Perform sight and performance checks before switching on the control panel.

Cable Connection Verification

Check if all necessary cables are connected for proper function.

DIP Switch Factory Settings

Verify DIP switch settings are according to factory defaults.

Mains Connection and Control

Connect mains power and check if the control is active.

Accumulator Connection and Control

Connect accumulator lines and verify control panel is active.

Performance Testing

Conduct performance tests for alarm, reset, and ventilation functions.

Smoke Vent Flap Operation Test

Verify that the smoke vent flap opens and closes correctly.

Examination Frequency and Scope

Examine system every six months or after repairs by trained personnel.

Fault Rectification and Logbook

Immediately eliminate faults and maintain a control book.

Automatic Fire Detector Testing

Testing automatic fire detectors using testers or cigarette smoke.

Smoke Vent Button Test

Test opening the smoke vent by pressing the red button.

Emergency Supply Test Setup

Prepare for emergency supply test by disconnecting mains power.

Emergency Supply Functional Test

Repeat functional tests to verify emergency supply.

Mounting and Installation Guide

Connection Diagrams

Related product manuals