EasyManua.ls Logo

Draper Foundation - Section 11.3 - Z-Axis Adjustment

Draper Foundation
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
page 21 of 28
Foundation
for LED Panels
Section 11.3 - Z - Axis Adjustment
1.
Using a 3mm hex wrench, adjust each Wall Adjuster Bracket until it contacts the wall.
2.
Use the clearance hole in the vertical rail to allow for a socket to drive a lag screw (by others) into the wall.
3.
Rotate the differential screw to push or pull the vertical rail to be straighter if required.
Differential
Screw
3mm Hex Wrench
WALL
ADJUSTMENT
BRACKETS
Adjust
Wall Adjustment
Brackets Until All
Vertical Rails are
flush.
Bubble Level recommended.
1
STUD
3mm Hex
Wrench
STUD
WALL ADJUSTMENT BRACKET
Mounting Access Hole
WALL
ADJUSTMENT
BRACKET
MOUNTING
HARDWARE
(by Others)
VERTICAL
RAIL
2
3
3mm Hex
Wrench

Other manuals for Draper Foundation