EasyManua.ls Logo

Draper Foundation User Manual

Draper Foundation
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
FOUNDATION
ATION
LEFT to RIGHT
for UpanelS
Left to Right Installation

Other manuals for Draper Foundation

Question and Answer IconNeed help?

Do you have a question about the Draper Foundation and is the answer not in the manual?

Draper Foundation Specifications

General IconGeneral
BrandDraper
ModelFoundation
CategoryIndoor Furnishing
LanguageEnglish

Summary

Important Safety Information

Before Beginning Installation

Guidance on site preparation and initial checks before installation.

Overview

Section 1 - Personnel and Tools Required

PERSONNEL REQUIRED

Identifies the personnel and tools needed for installation.

Section 2 - Components

Section 2 - Trim Frame Components

Section 3 - Determining Mounting Location

Section 3.1 - Mounting for 2-Rail Systems

Details on determining mounting location for arrays up to 6 panels high (2 rails).

Section 3.2 - Mounting for 3-Rail Systems

Section 4 - Assembling Horizontal Rails

Section 5 - Hanging Horizontal Rails

Hanging Rails for 2-Rail Systems

Instructions for hanging horizontal rails for arrays up to 6 panels (2 rails).

Hanging Rails for 3-Rail Systems

Instructions for hanging horizontal rails for arrays 7 panels or higher (3 rails).

Section 6 - Adjusting Horizontal Rails

Section 7 - Securing Wall Brackets

Section 8 - Attaching Wall Adjuster Brackets

Attaching Brackets for 2-Rail Systems

Attaching wall adjuster brackets for arrays up to 6 panels high (2 rails).

Section 8.2 - Vertical Rail Assembly (3-Rail Systems)

Lower Section Assembly

Assembly of the lower section of vertical rails for larger arrays (3 rails).

Upper Section Assembly

Assembly of the upper section of vertical rails for larger arrays (3 rails).

Section 9 - Rail Connectors and Fasteners

Connectors for 2-Rail Systems

Inserting rail connectors and fasteners for arrays up to 6 panels (2 rails).

Section 9.2 - Connectors for 3-Rail Systems

Section 10 - Attaching Vertical Rails

Attaching Rails for 2-Rail Systems

Attaching vertical rails for arrays up to 6 panels high (2 rails).

Section 10.2 - Vertical Rails for 3-Rail Systems

Attaching Bottom Vertical Sections

Attaching the bottom sections of vertical rails for larger arrays (3 rails).

Attaching Top Vertical Sections

Attaching the top sections of vertical rails for larger arrays (3 rails).

Section 11 - Adjusting Verticals

Section 11.1.1 - Y-Axis Adjustment for 2-Rail Systems

Y-axis adjustment for arrays up to 6 panels high using laser level.

Section 11.1.2 - Y-Axis Adjustment for 3-Rail Systems

Y-axis adjustment for larger arrays using laser level.

Section 11.2 - X-Axis Adjustment (Squaring)

Section 11.2.1 - Squaring Verticals for 2-Rail Systems

X-axis adjustment for arrays up to 6 panels high using alignment tools.

Section 11.2.2 - Squaring Verticals for 3-Rail Systems

X-axis adjustment for larger arrays using alignment tools.

Section 11.3 - Z-Axis Adjustment

Section 12 - Attaching Trim Brackets

Installing Top Trim Brackets

Instructions for installing top trim brackets onto the structure.

Installing Top Trim Support Brackets

Instructions for installing top trim support brackets.

Installing Side Trim Brackets

Instructions for installing side trim brackets onto the structure.

Section 12.4 - Installing Bottom Trim Brackets

Section 13 - Installing Bottom Trim

Installing Bottom Trim Sections

Installation of bottom trim sections before LED cabinet installation.

Section 14 - Attaching LED Panels

Attaching Spring-Loaded Fasteners

Process of attaching spring-loaded fasteners to LED cabinets.

Attaching LED Panels to Structure

Procedure for attaching LED panels to the foundation structure.

Section 15 - Attaching Trim to Brackets

Section 16 - Assembled Dimensions