Do you have a question about the Draper Foundation and is the answer not in the manual?
Brand | Draper |
---|---|
Model | Foundation |
Category | Indoor Furnishing |
Language | English |
Guidance on site preparation and initial checks before installation.
Identifies the personnel and tools needed for installation.
Details on determining mounting location for arrays up to 6 panels high (2 rails).
Instructions for hanging horizontal rails for arrays up to 6 panels (2 rails).
Instructions for hanging horizontal rails for arrays 7 panels or higher (3 rails).
Attaching wall adjuster brackets for arrays up to 6 panels high (2 rails).
Assembly of the lower section of vertical rails for larger arrays (3 rails).
Assembly of the upper section of vertical rails for larger arrays (3 rails).
Inserting rail connectors and fasteners for arrays up to 6 panels (2 rails).
Attaching vertical rails for arrays up to 6 panels high (2 rails).
Attaching the bottom sections of vertical rails for larger arrays (3 rails).
Attaching the top sections of vertical rails for larger arrays (3 rails).
Y-axis adjustment for arrays up to 6 panels high using laser level.
Y-axis adjustment for larger arrays using laser level.
X-axis adjustment for arrays up to 6 panels high using alignment tools.
X-axis adjustment for larger arrays using alignment tools.
Instructions for installing top trim brackets onto the structure.
Instructions for installing top trim support brackets.
Instructions for installing side trim brackets onto the structure.
Installation of bottom trim sections before LED cabinet installation.
Process of attaching spring-loaded fasteners to LED cabinets.
Procedure for attaching LED panels to the foundation structure.