EasyManua.ls Logo

Dunkirk PWXL - Initial Operational Boiler Test Check-Out Certificate & Signed Receipt

Dunkirk PWXL
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
24
INITIAL OPERATIONAL BOILER TEST CHECK-OUT CERTIFICATE & SIGNED RECEIPT
Boiler Manufacturer: Boiler Identi cation:
Model #: _______________________________________________
Serial #: ________________________________________________
Measured BTUh input: _____________________ Operational Test Date: ________ /________ /_________
Installation Instructions in the Installation, Operation and Maintenance Manual have been followed.
Initial Operational Boiler Test Check-Out Procedure has been performed.
Information on this form is certi ed to be correct.
All boiler instructions, wiring diagrams, piping diagrams, and supporting information shipped with this
boiler forwarded to owner/maintenance personnel.
Installation Location:
Customer Name: __________________________________________________________________________
Address: _________________________________________________________________________________
City: ________________________________________________ State: ________ Zip: ___________________
Installer Information
Company/Contractor: ______________________________________________________________________
Address: _________________________________________________________________________________
City: ________________________________________________ State: ________ Zip: ___________________
Telephone #: _____________________________________________________________________________
Installer’s Signature ___________________________________ Date: ________ /________ /_________
Installer’s Printed Name: ___________________________________________

Related product manuals